One recipe, every batch
Define each step once, with its people, equipment, and room.
Every batch becomes a sequence of steps with the equipment, rooms, and operators it needs, and each change is checked against their availability.
Recipes, rooms, equipment, and the people on the floor are managed together, so the schedule reflects how each batch will actually run.
Define each step once, with its people, equipment, and room.
See each room and piece of equipment hour by hour, including cleaning and calibration.
Find operators of the right type at the right site, with leave and daily hours checked.
Drag a step and its linked steps follow. Each change is checked against equipment, room, and operator availability at the new times.
Drag Dispensing to the right, or use the buttons, to start batch B07 later.
Illustrative checks for Site A on a Wednesday: steps linked finish to start, 8.0 daily working hours per operator, one task at a time per piece of equipment, and rooms set to hold one task at a time. In this example, Dispensing moves in 1-hour steps.
Every batch step, non-batch task, and leave on one calendar, with the numbers that need attention at the top.
Filter by location, batch, task, or room in a single view.
Batches on hold and batches without operators are counted at the top.
Open any entry for its operators, room, times, and next task.
Operators see and update the tasks at their designated site.
How Production Scheduling turns recipes, equipment, and operators into a schedule your team can run.
Download overview →
Supply Planning SeriesPart 3 of 3Producing supply, aligning horizons, and closing the loop with demand.
Read article →An introduction to SCmple and what it delivers for your team.
Download overview →Yes. Clinical and commercial batches share one timeline at each site, and each batch follows its own recipe, so both draw on the same operators, rooms, and equipment.
Linked steps shift automatically to keep their order, and SCmple checks operator, equipment, and room availability at the new times. Steps can be linked finish to start, start to start, finish to finish, or start to finish.
Leave and holidays are recorded for each operator, and any step that overlaps them is flagged. Find replacement lists operators of the same type at the same site who are free for that step.
Yes. Every batch belongs to a manufacturing site, and operators are designated to one or more sites. The dashboard and Gantt chart filter by site, so each team sees its own schedule while planners can see every site.
Operators see the tasks at their designated sites and can narrow the view to their own tasks. They update the status of each step as work moves forward and leave comments for the team.
Bring a recipe and a week of batches, and we will show you how SCmple schedules them with your steps, rooms, and operators.