Checked in every period
Lots leave the plan before they fall short of the shelf life you require, extensions included.
SCmple follows every lot through every period of the plan, from finished product to raw material, so every planned order is based only on inventory your rules allow.
Three planning needs unique to life sciences, handled in SCmple’s core planning engine.
Lots leave the plan before they fall short of the shelf life you require, extensions included.
Bills of materials turn finished product demand into drug substance needs.
Supply splits by allocation and capacity, then moves between sites by lane and campaign.
As our clinical programs have grown, SCmple has given us greater confidence in our supply planning. With multiple ongoing studies, a commercial launch, and additional programs ahead, having SCmple in place has been incredibly valuable.
Experienced planners have good reasons for the methods they use. SCmple lets your team choose how the key calculations work, so the plan follows your practice instead of asking you to change it.
Select a setting to see how it changes the plan.
Global settings apply across the portfolio, and most can be overridden for an individual material.
Each run produces a time-phased plan for every material, with the orders needed to keep supply on track.
| Category Type | Initial | Aug-26 | Sep-26 | Oct-26 | Nov-26 | Dec-26 |
|---|---|---|---|---|---|---|
| Demand | 3,611.11 | 1,666.67 | 1,666.67 | |||
| Projected Receipts | 800.00 | |||||
| Production Plan | 975.00 | |||||
| Safety Stock | 100.00 | 100.00 | 100.00 | 100.00 | 100.00 | |
| Projected Inventory | 5,271.00 | 2,459.89 | 793.22 | 793.22 | 793.22 | 101.55 |
| Months of Supply | 2.00 | 4.48 | 2.48 | 2.48 | 2.48 | 99.00 |
Each order shows when to release it, based on its full lead time.
Firmed orders stay put while the rest of the plan adjusts.
Expiring lots, forecast shifts, and supplier performance at a glance.
Sort, filter, and pivot the plan, then share it as a report.
Every supply plan is also the starting point for Scenario Planning.
Explore Scenario Planning →
Supply Planning SeriesPart 1 of 3Gathering every source of supply in biologics and ATMP supply chains.
Read article →
Supply Planning SeriesPart 3 of 3Producing supply, aligning horizons, and closing the loop with demand.
Read article →An introduction to SCmple Supply Planning, from the challenges to the value delivered.
Download brief →Every stock lot carries a quality status, and only statuses set to count in planning are included. Lots in quarantine stay out of the plan until they are released, so only inventory that meets your quality-status and shelf-life rules counts toward the plan.
Yes. Inventory is planned by site, and transfers between sites follow defined shipping lanes with their own transit times, including campaign-based shipping schedules.
Yes. Clinical and commercial materials are planned side by side in the same plan, and each material can follow the forecast version that fits it, such as a clinical supply plan alongside a commercial consensus forecast.
After every run, SCmple highlights lots expiring within 90 days, shortage alerts, and months of supply against safety stock, so your team can see which materials need attention before they open the detailed plan.
The planning horizon is set in months to suit your portfolio, with 24 months as the default, and a planning time fence can hold the near-term plan steady while orders beyond it adjust freely. Your team can run the plan on demand or on a schedule, for all materials or a selection, and each run happens in the background with a notification when it finishes.
Bring a product and the questions that matter most to your team, and we will walk you through how SCmple plans it, from finished product to drug substance.